EURO POLYMERS UP-166
UP-166 is a 1 component, liquid applied Polyurethane waterproofing membrane. Product is widely used, has high elongation and elasticity, withstand thermal expansion of concrete, mortar, etc
➦ Application range:
• Waterproof membranes outdoors or indoors.
• Roofs, balconies. exterior walls, water tanks, water retaining structures, tunnels, concrete pipelines for new and renovated projects
• Bathroom area, toilet, etc
• If using for outdoor roofs/walls, apply additional UV protection coating UP-266 Top Coat at the rate of 0.25-0.30 kg /m2/2 coats.
➦ Feature
• Well adhesion to all surfaces such as concrete mortar, metal, ett
• High elongation and elasticity
• High adhesion, low odor
• Durable and chemical resistant
• Form a continuous and seamless membrane
• Easy to apply and repair
• Can be used for both horizontal / vertical surfaces
• One-component pure polyurethane
• Comprehensive waterproofing solution for the overall project
• Waterproof - water resistant
➦ Surface preparation
• The substrate should be dry, clean and free from laitance. oil, dust. paint residues, algae. loose and friable material must be completely removed from all surfaces before application of the product
➦ Mixing
• Stir well UP-166 using paint mixer for 1-2 mins before application
• DILUTION: The dilution is only done when necessary to make the application more convenient (low temperature, rough surface,...). Use 3-5% Xylene by volume, required to mix well using paint mixer in 1-2 minutes before application.
• Note: The thinner should be tested on a small area to ensure suitability prior to application. Dilution may effect the physico-mechanical properties and drying time of the produc. Absolutely do not mix more than 5% of Xylene thinner
➦ Priming
• Use Euro Polymers UP-100 Primer (dried substrate) or EP-2WT (damped substrate), leave it thy for 1-4 hours (not exceed 48 hours) prior application of UP-166
➦ Application
• UP-166 can be applied by brush, roller, steel and notch trowel.
• Leave the 1st applied coat 4-24 hours (not exceed 48 hours) then apply 2nd coat to ensure the good bonding between coats.
• For protective motar requirements: apply clean and dry quartz sand to roughen while the final layer of UP-166 is still wet.
➦ Consumption
• 0.75-1.2 kg/m2/coat (do not apply >1.80 kg/m2/coat), 2 coats are required.
• The coverage might vary depend on the substrate absorbent
➦ Specification
We hope that the information in the article will be useful for you to choose the right waterproofing solutiion.
We are very pleased to serve you.
Create a free Listing to introduce your business and be visible to your potential customers
_________________________________
YELLOW PAGES CONTACT
+84 24.3636.9512 (Ext 312)
Hotline/ Zalo: +84 914 261 828 (Ms Amy)